Uptime 23,4m motion compensated gangway

Uptime 23,4m gangway (19,4m +/- 4m) delivered for two purposes:

Picture 1: Siem Moxie 74meter dedicated wind farm vessel using bumper/push on for short time connection.

Picture 1: Siem Offshore vessel – Siem Moxie

Picture 2: HOS Achiever 135meter accommodation vessel with Oil & Gass charter using landing cone for long term connection

                       Picture 2: Hornbeck Offshore vessel – HOS Achiever