UPTIME gangway at Baltic 2

“Island Crown” with the 23,4m AMC gangway is here seen working at Baltic 2

Only with the UPTIME AMC system can the gangway dock directly to a flat bulkhead and the crew can walk across without landing the gangway.

Multiple redundancies and safeguards make sure this operation is safe and efficient for the vessel and crew.

kuttet1375